Economic and financial appraisal of the Monrovia water transmission main replacement project
Economic and financial analysis of projects
The assignment
Economic and financial appraisal (project appraisal report, PAR) for the replacement of 15.2 km of prestressed concrete transmission main (36 inches) with a ductile iron pipe (48 inches), to secure Monrovia's water supply and improve the operational efficiency of the Liberia Water and Sewer Corporation (LWSC).
- Financial forecast model of LWSC: revenue, OPEX and investment needs
- Cost-benefit analysis of the increased transmission capacity and reduced network losses
- Quantification of indirect benefits: public health, productivity, industrial activity
- Profitability indicators (economic and financial NPV and IRR)
- Viability of water tariffs, cost recovery and sustainability of operation and maintenance
- Risk analysis, sensitivity tests and recommendations for the Bank's grant
Similar projects
- Infrastructure2025 – 2026
Financial and economic analysis for the completion of the Rural Drinking Water and Sanitation Project (PEPA-MR)
- Client
- African Development Bank
- Country
- Burkina Faso
- Mission
- Ex-post evaluations and completion reports (PCR, ICR, XSR)
- Infrastructure2023 – 2024
Concession study for the Medjez El Bab – Le Kef motorway (114 km)
- Client
- Ministry of Equipment and Housing
- Country
- Tunisia
- Mission
- Public-private partnerships
- Infrastructure2022
Master plan for hydro-agricultural development and integrated development (SDADI) and 21,000 ha priority investment programme on the Niger River
- Client
- Ministry of Rural Development
- Country
- Mali
- Mission
- Economic and financial analysis of projects
A project in mind?
Tell us about your project, your terms of reference or your call for tenders. We will get back to you shortly.